Documents Needed for a PVC Goods Quotation: Size, Quantity, SKU, and Packaging
For PVC keyrings, bag charms, fridge magnets, soft vinyl-style figures, and similar custom goods, a design image alone is usually not enough for an accurate quotation. Preparing size, quantity, SKU, packaging, attachments, inspection, and delivery conditions in advance helps Chinese factories quote faster and reduces later cost changes.

Quotation Request Checklist
Prepare these items before inquiry to improve quotation accuracy and response speed.

Artwork Files and Specification Sheet
Quotation materials should do more than show the design. They should help the factory judge the production method, mold structure, color count, printing process, and required attachments.
- Prepare formats such as AI, PDF, PNG, or other easy-to-check files
- Separate front, back, side, and raised-detail views
- State color count, color areas, print range, and raised PVC areas
- If existing IP or brand logos are used, clarify that usage rights have been checked
A simple image reference often leads only to a rough estimate. Add dimensions and process details in the same spec sheet to reduce quotation gaps.

How to Specify Size, Thickness, and PVC Hardness
For PVC goods, size and thickness affect material usage, mold structure, molding time, and packaging size. Include attachment positions and hardness requirements when they matter.
- Specify width, height, and thickness in millimeters
- For 3D parts, separate maximum thickness from average thickness
- Share PVC hardness or a reference sample when softness is important
- Add position dimensions for holes, magnets, tags, and metal fittings
If size is not final, request multiple options such as approximately 50mm, 70mm, and 100mm so you can compare cost before deciding.

Quantity, SKU, and Variant Breakdown
Total quantity alone is not enough when there are color, shape, or attachment variations. SKU-level details help the factory estimate color changes, mold changes, inspection effort, and individual packaging work.
- List SKU name, item code, color, quantity, and barcode/JAN requirements
- Show both total quantity and quantity by SKU
- Define random packing, set packing, and assortment ratios early
- If a SKU is below MOQ, ask about alternatives or shared mold options
A total of 3,000 pcs can mean 6 SKUs x 500 pcs or 1 SKU x 3,000 pcs. The quotation and lead time will be different.

How to Provide Packaging, Label, and Carton Specs
Packaging affects unit cost, labor time, shipping volume, and retail presentation. Define individual packaging, backing cards, JAN labels, carton quantity, and carton size before final quotation.
- Choose OPP-only, backing card, blister, set box, or other packaging format
- Specify JAN labels, item-code labels, and country-of-origin marks
- Confirm units per carton, carton size, and weight limits
- Adjust protection based on retail display, e-commerce shipping, or event sales
Adding packaging later may change material cost, labor, inspection flow, and carton size, so include it in the first quotation request whenever possible.

What to Include in the Quotation Request Sheet
Use a fixed request-sheet format instead of relying only on email text. This makes it easier to compare several factories under the same conditions.
- Product name, use case, sales region, and target delivery date
- Size, thickness, quantity, SKU table, and color references
- Attachments, packaging, inspection criteria, and delivery terms
- Sample request, mold fee, and unit price by quantity tier
Ask for quantity tiers such as 1,000 / 3,000 / 5,000 pcs to support sales planning and budget decisions.
Extra Checks That Improve Quotation Accuracy
These items often affect unit price, lead time, and later trouble response.
Attachments
Specify material, color, strength, and attachment method for rings, chains, clasps, straps, and magnets.
- Metal color
- Position
- Pull test
Samples and mold fee
Clarify whether a new mold is required, how many sample rounds are included, and what revisions cost.
- Mold fee
- Sample fee
- Revision cost
Inspection terms
Share criteria for appearance, dimensions, color, metal fitting strength, and packaging condition.
- AQL
- 100% inspection
- Third-party QC
Delivery terms
Total cost changes depending on DDP, FOB, CIF, warehouse delivery, and split shipment.
- Lead time
- Destination
- Shipping docs
Market compliance
Depending on sales region and target age, RoHS, REACH, EN71, or other checks may be needed.
- Sales region
- Use case
- Test reports
Communication
Record changes and approvals with photos, drawings, and dates.
- Change log
- Approved sample
- Fixed contact
Why PVC Quotations Change and How to Prevent It
When the first estimate and final unit price differ greatly, the cause is often missing information or late-added specifications.
| Missing Information | Likely Problem | Provide This Early |
|---|---|---|
| Size and thickness | Material cost, mold fee, and packaging size change | Dimensions, thickness, and tolerance in mm |
| Quantity by SKU | Color changes, packing labor, and inspection effort are unclear | SKU table, quantity, barcode/JAN, assortment ratio |
| Packaging specs | Individual packing labor and carton cost are added later | OPP, backing card, label, carton quantity |
| Attachments | Metal fitting cost, assembly process, and strength test are missed | Fitting type, color, material, and position |
| Inspection criteria | Buyer and factory judge defects differently | Appearance standard, AQL, key inspection items |
| Delivery terms | Logistics cost, duties, and delivery time need separate estimation | Destination, trade terms, target arrival date |

Fix Quotation Conditions After Sample Approval
If specifications change after sample approval, mold revision cost or schedule changes may occur. Store approved samples, color samples, and packaging samples by SKU and link them to the quotation version.
- Store approved samples by item code
- Track changes by quotation number and date
- Reconfirm the final specification sheet before production

Include Packaging, Inspection, and Shipping in the Quote
Comparing only product unit price can hide later packaging, inspection, and logistics costs. For total cost planning, include pre-shipment inspection and delivery conditions.
- Separate packaging and inspection fees
- Request pre-shipment photos and QC reports
- Compare under real delivery terms such as DDP or warehouse delivery
Final Checklist Before Inquiry
At minimum, prepare these seven items for a smoother PVC goods quotation.
- Artwork files, reference images, and specification sheet
- Size, thickness, PVC hardness, and tolerance
- Total quantity, quantity by SKU, and assortment ratio
- PANTONE / DIC, color sample, and material texture
- Attachments such as metal rings, magnets, and backing cards
- OPP bag, JAN label, carton, and set-packing requirements
- Target lead time, delivery terms, and inspection criteria
Related PVC Pages
Need Help Preparing PVC Goods Quotation Materials?
Even if size, SKU, or packaging details are not fully fixed yet, we can help organize the information needed for quotation. If you already have artwork, please send it with your target quantity.
