Confidential IP Approval Guide
Custom Plush NDA and Approval Workflow
Custom plush projects for unreleased characters need more than an NDA status. Define file recipients, sharing channels, version control, sample comments and pre-production approval as one workflow.

Six operating points to define before approval starts
Review the contract status and day-to-day production operation separately, with named contacts and records.
Confirm status, project scope and which files may be shared.
List buyer, agency, licensor and factory contacts with approval authority.
Define storage, email, access permission and re-sharing rules by project.
Use consistent file names, SKU, dates, revision numbers and replacement history.
Mark location, requested change, priority and response date on photos or drawings.
Record the approved sample, color, packaging, approver and approval date.
Roles from NDA confirmation to pre-production approval
Define what the buyer provides, what the production team returns and which record remains at every stage.
| Stage | Buyer or approver | Factory or production team | Record | Common gap |
|---|---|---|---|---|
| NDA and scope | Confirm terms, IP scope, disclosure scope and contacts | Limit intake to the assigned project team | Status, project and contact list | Check Files or people outside the project scope are included |
| Confidential file intake | Share current artwork, colors, settings and restrictions | List received files and missing information | File name, revision, date and recipient | Check An older or replaced reference is used |
| First sample | Define review items and approvers | Provide sample photos, dimensions and deviations | Sample number, photos and specification | Check Review angle or required evidence is missing |
| Revision instruction | Consolidate comments with priority | Restate each request and report feasibility or impact | Comment number, answer and revised version | Check Instructions from different approvers conflict |
| Revised sample | Separate completed, open and next-review items | Compare changes against the previous version | Change log, comparison photos and open items | Check Previous comment status cannot be traced |
| Pre-production approval | Final approver checks specification, color and packaging | Freeze the approved version as the production reference | Approver, date and final revision | Check Production preparation starts from an unapproved version |
Original Flow: From NDA Scope to Pre-Production Approval
Carry the same project and revision identifiers through file intake, samples, comments, revisions and approval.
Confirm IP, files and contacts
Register the current revision
Share photos, dimensions and specs
Consolidate and track changes
Record approver and final version
Four points for usable revision instructions
Approval comments should let every participant identify the same location, change and priority.
Assign an ID to each request and use it for the answer and recheck.
Mark the location on a photo or drawing and show current versus requested state.
Separate required changes, discussion items and next-review items.
Consolidate input on the buyer side and issue one current instruction set.
Three approval points to support with photos and records
Show the management method without exposing any confidential character artwork on the public page.

Match photos, dimensions and the specification with one sample number.

Connect file name, date, revision and comment identifiers.

Match the approved specification, packaging and labels to the production reference.
Information to prepare before inquiry
You do not need to publish the contract itself. Confirm the NDA status, sharing conditions, approval team and production requirements.
- Internal IP or project name
- Unreleased or already public
- Buyer, agency and licensor roles
- NDA status
- Permitted file scope
- Required channel and authorized recipients
- Approval contact and final approver
- Comment-consolidation method
- Expected review stages
- Design, size and SKU count
- Quantity, packaging and target timing
- Items requiring production approval
Related pages
The NDA and approval workflow connects to corporate character plush, promotional projects, quotation files, SKU management and inspection.
FAQ
Should the NDA be signed before files are shared?
Timing, signing parties and covered files depend on the project and buyer policy. Confirm the required conditions with the buyer's legal or contract contact before sharing unreleased materials.
Can we discuss an estimate before the NDA is signed?
General conditions such as size, quantity, SKU count, packaging and target timing may sometimes be discussed within the permitted public scope. Follow the project rule for confidential design files.
Who should consolidate approval comments?
It is easier to proceed when the buyer or licensor issues one current instruction set and names the final approver. When comments arrive separately, confirm which version is valid.
What format works for revision instructions?
Mark the location, current state, requested state, priority and comment ID on a sample photo or drawing, then track the response and recheck in one table.
How are confidential IP files handled?
Use the recipients, channel, access permissions, retention and deletion conditions agreed for the project. Align the operation with the NDA and buyer's internal policy.
What should we provide for an inquiry?
Share the NDA status, permitted disclosure scope, approval contact, SKU count, size, quantity, packaging, target timing and items that require pre-production approval.
For unreleased IP projects, define the recipients, revision control and approval route before files are shared
Confirm the NDA status, sharing conditions, approval contact and production requirements so the sample, revision and approval workflow can be organized for the project.
